What gauge of wiring is legally required for an electric vehicle charger circuit installation in a newly constructed underground parking garage in downtown Brooklyn
Download run
Fan-out diagram
The searches the AI actually ran for this prompt.
SEED QUERY
What gauge of wiring is legally required for an electric vehicle charger circuit installation in a newly constructed underground parking garage in downtown Brooklyn
3 real searches · 1 real-search pass
New York City Electrical Code 2025 EV charging station conductor sizing underground parking garage requirements 2026Google ↗
OBSERVEDInstruction
NYC building code electric vehicle charging infrastructure parking garage new construction electrical requirements 2025Google ↗
OBSERVEDReason
NYC electrical code adoption effective date 2025 2026 2023 NEC EVSE 625 conductor sizingGoogle ↗
OBSERVEDInstruction
Badge and edge weight = share of passes that produced the query. Hover a query for its intent and routing format.
Query classes
Google's semantic query class for every sub-query: what kind of answer each search is after, simulated vs real.
ChatGPT real searches (3)
Classes come from the query-classifier (a local Laya model). 2 of 3 calls are low-confidence (under 50%) — hover a query in the table to see its confidence.
Searches and sources
ChatGPT3 real searches · gpt-6
New York City Electrical Code 2025 EV charging station conductor sizing underground parking garage requirements 2026 Google ↗
NYC building code electric vehicle charging infrastructure parking garage new construction electrical requirements 2025 Google ↗
NYC electrical code adoption effective date 2025 2026 2023 NEC EVSE 625 conductor sizing Google ↗
- 406.4.10 Electric vehicle supply equipment (EVSE). · codelibrary.amlegal.com
- Local Law 55 of 2024 · nyc.gov
- Electrical Code · nyc.gov
- Project Requirements - Design Professional - Electrical Systems · nyc.gov
Queries
3 queries · click a column to sort
| Query / type | Search | Intent | Query class | Routing format | Cluster | Freq ↓ | Weight |
|---|---|---|---|---|---|---|---|
New York City Electrical Code 2025 EV charging station conductor sizing underground parking garage requirements 2026 OBSERVED | Google ↗ AI Mode ↗ | — | Instruction | — | — | 1x of 1 | |
NYC building code electric vehicle charging infrastructure parking garage new construction electrical requirements 2025 OBSERVED | Google ↗ AI Mode ↗ | — | Reason | — | — | 1x of 1 | |
NYC electrical code adoption effective date 2025 2026 2023 NEC EVSE 625 conductor sizing OBSERVED | Google ↗ AI Mode ↗ | — | Instruction | — | — | 1x of 1 |