Can you outline the NEC clearance requirements for upgrading a 100-amp Federal Pacific fuse box to a 200-amp breaker panel in a tight basement utility room?
Download run
Fan-out diagram
The searches the AI actually ran for this prompt.
SEED QUERY
Can you outline the NEC clearance requirements for upgrading a 100-amp Federal Pacific fuse box to a 200-amp breaker panel in a tight basement utility room?
1 real search · 1 real-search pass
2023 NEC 110.26 working space 0-150 volts to ground 3 feet dedicated space panelboard 110.26(E) requirementsGoogle ↗
OBSERVEDInstruction
Badge and edge weight = share of passes that produced the query. Hover a query for its intent and routing format.
Query classes
Google's semantic query class for every sub-query: what kind of answer each search is after, simulated vs real.
ChatGPT real searches (1)
Classes come from the query-classifier (a local Laya model). 1 of 1 calls are low-confidence (under 50%) — hover a query in the table to see its confidence.
Searches and sources
ChatGPT1 real searches · gpt-6
2023 NEC 110.26 working space 0-150 volts to ground 3 feet dedicated space panelboard 110.26(E) requirements Google ↗
- National Fire Protection Association Report · docinfofiles.nfpa.org
- Working Space Clearance Calculator | NEC 110.26 · electricaltoolbox.com