What essential items should not be skipped during a pre-drywall inspection of a new construction steel-frame building in an urban environment like Brooklyn?
Download run
Fan-out diagram
The searches the AI actually ran for this prompt.
SEED QUERY
What essential items should not be skipped during a pre-drywall inspection of a new construction steel-frame building in an urban environment like Brooklyn?
2 real searches · 1 real-search pass
Badge and edge weight = share of passes that produced the query. Hover a query for its intent and routing format.
Query classes
Google's semantic query class for every sub-query: what kind of answer each search is after, simulated vs real.
ChatGPT real searches (2)
Classes come from the query-classifier (a local Laya model). 1 of 2 calls are low-confidence (under 50%) — hover a query in the table to see its confidence.
Searches and sources
ChatGPT2 real searches · gpt-6
NYC DOB construction inspections steel fireproofing firestopping building envelope special inspections official Google ↗
NYC building code special inspections structural steel fire resistant materials firestopping official Google ↗
- 2022BC_Chapter17_SpecialInspectionsWBwm.pdf · nyc.gov
- 110.3.4 Fire-resistance-rated construction inspection. · codelibrary.amlegal.com
- Project Requirements - Skilled Trades - Mechanical · nyc.gov
Queries
2 queries · click a column to sort
| Query / type | Search | Intent | Query class | Routing format | Cluster | Freq ↓ | Weight |
|---|---|---|---|---|---|---|---|
NYC DOB construction inspections steel fireproofing firestopping building envelope special inspections official OBSERVED | Google ↗ AI Mode ↗ | — | Reason | — | — | 1x of 1 | |
NYC building code special inspections structural steel fire resistant materials firestopping official OBSERVED | Google ↗ AI Mode ↗ | — | Instruction | — | — | 1x of 1 |