Real ChatGPT answer · index seed6eEjVLWeyP0completeHome services and improvement · plumbinginformational
What is the correct slope percentage per foot required for horizontal drainage piping under a basement concrete slab to prevent solid waste buildup?
Download run
Fan-out diagram
The searches the AI actually ran for this prompt.
SEED QUERY
What is the correct slope percentage per foot required for horizontal drainage piping under a basement concrete slab to prevent solid waste buildup?
2 real searches · 1 real-search pass
Badge and edge weight = share of passes that produced the query. Hover a query for its intent and routing format.
Query classes
Google's semantic query class for every sub-query: what kind of answer each search is after, simulated vs real.
Classifying 2 queries…
Searches and sources
ChatGPT2 real searches · gpt-6
2021 International Plumbing Code section 704.1 slope horizontal drainage piping table 704.1 official Google ↗
Virginia plumbing code 2021 horizontal drainage piping slope 704.1 Google ↗
- CHAPTER 7 SANITARY DRAINAGE · codes.iccsafe.org
- PLUMBING SYSTEMS · dhcd.virginia.gov
Queries
2 queries · click a column to sort
| Query / type | Search | Intent | Query class | Routing format | Cluster | Freq ↓ | Weight |
|---|---|---|---|---|---|---|---|
2021 International Plumbing Code section 704.1 slope horizontal drainage piping table 704.1 official OBSERVED | Google ↗ AI Mode ↗ | — | — | — | — | 1x of 1 | |
Virginia plumbing code 2021 horizontal drainage piping slope 704.1 OBSERVED | Google ↗ AI Mode ↗ | — | — | — | — | 1x of 1 |