What permits are necessary from my city utility provider to connect a hardwired 48-amp EV charger to my home electrical grid?
Download run
Fan-out diagram
The searches the AI actually ran for this prompt.
SEED QUERY
What permits are necessary from my city utility provider to connect a hardwired 48-amp EV charger to my home electrical grid?
2 real searches · 1 real-search pass
Badge and edge weight = share of passes that produced the query. Hover a query for its intent and routing format.
Query classes
Google's semantic query class for every sub-query: what kind of answer each search is after, simulated vs real.
ChatGPT real searches (2)
Classes come from the query-classifier (a local Laya model). 2 of 2 calls are low-confidence (under 50%) — hover a query in the table to see its confidence.
Searches and sources
ChatGPT2 real searches · gpt-6
Florence Kentucky electrical permit residential EV charger hardwired electrical permit authority Google ↗
Duke Energy Kentucky residential EV charger installation service upgrade notification permit requirements Google ↗
- § 156.02 APPOINTMENT OF INSPECTOR. · codelibrary.amlegal.com
- § 156.03 REPORT TO INSPECTOR. · codelibrary.amlegal.com
- § 156.04 INSPECTION AND APPROVAL PREREQUISITE TO CONNECTION. · codelibrary.amlegal.com
- Duke Energy Reward Center · chargerprep.duke-energy.com
- U.S. DEPARTMENT OF · afdc.energy.gov
- City of Florence official contact page · florence-ky.gov
Queries
2 queries · click a column to sort
| Query / type | Search | Intent | Query class | Routing format | Cluster | Freq ↓ | Weight |
|---|---|---|---|---|---|---|---|
Florence Kentucky electrical permit residential EV charger hardwired electrical permit authority OBSERVED | Google ↗ AI Mode ↗ | — | Instruction | — | — | 1x of 1 | |
Duke Energy Kentucky residential EV charger installation service upgrade notification permit requirements OBSERVED | Google ↗ AI Mode ↗ | — | Instruction | — | — | 1x of 1 |