What are the cost implications and retroactive date considerations when switching a design firm's errors and omissions policy from claims-made to occurrence?
Download run
Fan-out diagram
The searches the AI actually ran for this prompt.
SEED QUERY
What are the cost implications and retroactive date considerations when switching a design firm's errors and omissions policy from claims-made to occurrence?
3 real searches · 1 real-search pass
design professional liability insurance claims-made occurrence retroactive date extended reporting period architect engineer policyGoogle ↗
OBSERVED
AIA professional liability claims-made retroactive date tail coverage architects engineersGoogle ↗
OBSERVED
IRMI claims-made occurrence professional liability retroactive date extended reporting periodGoogle ↗
OBSERVED
Badge and edge weight = share of passes that produced the query. Hover a query for its intent and routing format.
Query classes
Google's semantic query class for every sub-query: what kind of answer each search is after, simulated vs real.
Classifying 3 queries…
Searches and sources
ChatGPT3 real searches · gpt-6
design professional liability insurance claims-made occurrence retroactive date extended reporting period architect engineer policy Google ↗
AIA professional liability claims-made retroactive date tail coverage architects engineers Google ↗
IRMI claims-made occurrence professional liability retroactive date extended reporting period Google ↗
- The Retroactive Date – When Timing is Everything · phelps.com
- Architects and Engineers Tail Coverage · profunderwriters.com
- FAQs on Extended Reporting (“Tail”) Coverage · americanbar.org
- Claims Made Policy vs Occurrence Policy · profunderwriters.com
- Claims Made Policy · profunderwriters.com
- Claims-Made Policies—Timing Is Everything · irmi.com
Queries
3 queries · click a column to sort
| Query / type | Search | Intent | Query class | Routing format | Cluster | Freq ↓ | Weight |
|---|---|---|---|---|---|---|---|
design professional liability insurance claims-made occurrence retroactive date extended reporting period architect engineer policy OBSERVED | Google ↗ AI Mode ↗ | — | — | — | — | 1x of 1 | |
AIA professional liability claims-made retroactive date tail coverage architects engineers OBSERVED | Google ↗ AI Mode ↗ | — | — | — | — | 1x of 1 | |
IRMI claims-made occurrence professional liability retroactive date extended reporting period OBSERVED | Google ↗ AI Mode ↗ | — | — | — | — | 1x of 1 |