Real ChatGPT answer · index seed1kvgxH6hIx0completeHome services and improvement · solar panelsinformational
What steps are required to get permission to operate from an electric cooperative that currently has a moratorium on new residential net metering interconnections?
Download run
Fan-out diagram
The searches the AI actually ran for this prompt.
SEED QUERY
What steps are required to get permission to operate from an electric cooperative that currently has a moratorium on new residential net metering interconnections?
2 real searches · 1 real-search pass
Badge and edge weight = share of passes that produced the query. Hover a query for its intent and routing format.
Query classes
Google's semantic query class for every sub-query: what kind of answer each search is after, simulated vs real.
ChatGPT real searches (2)
Classes come from the query-classifier (a local Laya model). 2 of 2 calls are low-confidence (under 50%) — hover a query in the table to see its confidence.
Searches and sources
Queries
2 queries · click a column to sort
| Query / type | Search | Intent | Query class | Routing format | Cluster | Freq ↓ | Weight |
|---|---|---|---|---|---|---|---|
Virginia electric cooperative residential net metering interconnection moratorium permission to operate rules 2026 OBSERVED | Google ↗ AI Mode ↗ | — | Reason | — | — | 1x of 1 | |
Virginia net metering statute electric cooperatives interconnection rules SCC 2026 OBSERVED | Google ↗ AI Mode ↗ | — | Reason | — | — | 1x of 1 |